IPv6 is the talk of the Internet, there are varying degrees of urgency stating that we will run out of existing IPv4 space within 2 years, with some saying there is enough IPv4 space left for 10 years. No matter which prediction is correct, eventually, IPv4 space will be exhausted and companies will have to begin migrating to IPv6 to ensure the availability of publicly routable IP space. Few companies have begun to evaluate the problem in detail; the sooner companies begin to evaluate their infrastructure, the more smoothly they can plan a migration from IPv4 to IPv6 and the longer period of time they can amortize the costs over.
IPv6 is an upgrade to the most basic elements of the internet and the networks that connect companies, individuals and the devices we have become so accustomed to using like our Blackberrys, iPhones and laptops. Making changes to the basis of all connectivity is not an easy thing to accomplish, or even begin planning for. The dependencies are unique and well established over many years of additions, improvements and research around IP connectivity. In this paper I intend to break down the process for companies to begin evaluating this upgrade to there infrastructure so that a strategic plan for IPv6 deployment can be developed.
Deployment Options
When deploying IPv6 there are a variety of options to ensure that no services will be interrupted during the time that both IPv4 and IPv6 are operational; both at your company, and across the global internet. Both options are important to consider because they each can work for specific cases to provide a bridge to IPv6 enable a system or application.
Parallel Stacks
When evaluating options for implementing IPv6 without impacting existing IPv4 traffic, most companies are looking to vendors to provide parallel stack capability, also called dual stack in some cases. By utilizing a parallel stack solution, companies can bring up IPv6 capability in parallel to their existing IPv4 deployments. This ensures that services can be migrated as they are fully tested and validated on IPv6. This parallel stack solution does come at a cost because of the overhead of administering two separate logical networks within a single physical network.
IPv6 NAT-PT
Todays modern routers are also offering capabilities to do NAT for traffic between IPv4 and IPv6, and vice-versa. IPv6 NAT-PT is a capability to have devices in your network with both IPv4 and IPv6 addresses assigned to them, these devices can then used as gateways for devices to use as a connection point to newer IPv6 devices. IPv6 NAT-PT was designed to provide a step from IPv4 to IPv6. IPv6 NAT-PT is a very specific use of the above mentioned parallel stack; ensuring that devices that only speak one protocol, can access devices speaking the alternate protocol.
Assessment
Overall Questions
The first step to evaluating the impact of an IPv6 update is by reviewing the high level components of your Information Technology (IT) systems. This evaluation is to begin looking at vendor commitments, capability and simplicity of system upgrades and regulatory impacts:
1)Inventory all vendors you currently use, document what there current and future support plans are for IPv6? What assistance can they provide either through documentation or consulting services to assist with a migration?
2)Review all applications, which ones are developed in house and which are commercial software? Are all the commercial software vendors still in business?
3)Do you have any legacy systems that no longer are covered by support agreements?
4)Do you have any systems that are covered by federal laws for data consistency? What legal rules are in place governing how these systems are tested and maintained?
Infrastructure Tiers
The next step is to systematically evaluate each component that contributes to the operational capability of your IT systems:
Network – Todays networks are complex sets of routers, switches, Intrusion Detection Systems (IDS) and physical links between sites. To properly assess this portion for an IPv6 upgrade, an audit must be done for each device. It should assess what types of Deployment Options the device supports, how the vendor plans to support IPv6 on this platform and, what upgrades, either software or hardware will be required for IPv6 support.
VPN Infrastructure – Enterprises are increasingly reliant on VPNs to secure traffic in todays mobile workforce. The software and hardware supporting these VPN sessions needs to be tested and evaluated to ensure it will support future IPv6 connections and traffic as well as a mix of traffic during any transition periods.
Applications – Applications will be the most complex and time consuming component of the evaluation process. Most companies have many dozens of applications in place, if not more, that must be evaluated to ensure that they will properly migrate to IPv6. This assessment for each application will need to include outside dependencies like license servers, database servers or client software on users individual machines.
Monitoring Tools – Todays enterprises have a diverse collection of tools used for monitoring network usage, network performance, application usage, application availability, users connection. All this information is critical to both developing and ensuring compliance with SLAs. As part of a complete IPv6 assessment all monitoring tools, both performance and availably, should be evaluated to ensure they can provide the same level of detail in monitoring, as well as properly store and report data that could be IPv6 or IPv4 specific.
Core services – Core services, including DNS, DHCP, and file sharing are some of the most critical components to an IPv6 migration. These services form the basis for all user experiences and if implemented correctly, will ensure that a transition to IPv6 is seamless to the users.
Mobile Devices – Mobile devices are becoming a standard for doing business in todays mobile workforce. As you begin to develop your IPv6 transition plan, it is important to include these as part of the assessment to ensure they will continue to operate through the transition and when the transition is complete. You should begin by speaking with your mobile device vendors to understand if the carriers network will support your IPv6 plans, as well as your employees handheld devices. This assessment will allow you to develop a cost associated with upgrading or replacing units in the field.
End Users Systems – Todays mobile workforce means that many staff have a laptop and a desktop system at a minimum, with more then one laptop per person in a lot of cases. All these devices need to be evaluated for IPv6 support to see if they will support the proposed changes, and what, if any upgrades will be needed for full support. This will have an impact to both the schedule and cost of an IPv6 deployment.
Migration Timeline
Now that we have developed a list of what will need to be upgraded, and paired that with a list of what upgrades our vendors will support, we can use that to develop a process and timeline to test all necessary changes, upgrade appropriate systems and eventually move an an environment where IPv6 is fully operational across all IT systems. This planning stage, taking what we know will need to be updated and planning how to update and test it, is the most important part of an IPv6 migration. This stage is our best opportunity to ensure we understand the time commitments for this project, the costs this project will incur and the potential challenges we will run into.
As we develop a complete migration process, there are many angles that must be included to ensure all services rolled out are ready for prime time and allow your staff to be as proficient as they were in an all IPv4 world. We must ensure that we understand what software will need to be upgraded, what software re-written, and how to test those changes so that we do not introduce complications.
After we have a plan for making the appropriate software updates and testing them, you can develop a detailed plan for how to implement IPv6. This plan should include which services will be upgraded first, second and so on. This plan should also include what groups of users will be the first to migrate so that they can be made aware of the plans and provide input during the migration process. This input can then be used to make each subsequent step smoother then the previous one.
In addition to the migration plans and testing plans, plans for disaster recovery and maintenance will need to be updated. Because IPv6 is such a radical change from current technologies, most maintenance plans and disaster recovery plans will need to be updated to handle the varied techniques that will need to be used once IPv6 is in place and operational.
Industry Commitments
The last big question lingering after a through assessment of your infrastructure is, what about the rest of the industry and our vendors? That is currently a point of contention in the vendors space, vendors are hesitant to implement IPv6 capability until customers demand it, and customers are hesitant to implement IPv6 until vendors provide a fully support capability in there products. The most visible of this contention is with todays modern firewall products, today very few fully support the RFCs around IPv6, but as most companies look to IPv6, this is an early capability that must be in place to continue rolling out IPv6.
As time continues, more and more vendors will adopt and support IPv6 in the same ways they support IPv4. IPv4 has taken decades to grow to the point of adoption it is at now, along that path many, many enhancements have been made to the routers, switches and servers that power our enterprise environments. As time continues to progress, more and more customers will push vendors to add complete IPv6 capabilities, as they do it will enable a larger portion of companies to begin to fully embrace IPv6.
Monday, September 15, 2008
Thursday, September 4, 2008
Hardware TCO – Predictable Planning with Refresh Cycles
Often, the most expensive investment any Information Technology (IT) organization will make is its base infrastructure; servers, storage and other various hardware. Yet, these hardware purchases are often given much less thought then software or services purchases and assumed to be routine, and just a cost of doing business. Hardware typically has several phases that should be evaluated as part of the purchase, these include the initial purchase price, the cost of maintaining it, and the ultimate cost of refreshing the hardware at the end of it's useful life. All should play an equal balance when evaluating new platforms, refresh cycles and testing new solutions for introduction to a company.
Often times when a company begins to assess the total cost of ownership (TCO) around its IT assets, it must involve teams not traditionally involved in IT planning. These teams can include facilities, engineering, building managers, application developers and data base administrators. Each of these groups can provide valuable input on how the servers and other infrastructure affect there environments and costs on a yearly basis.
There are three primary phases to all hardware purchases:
Initial Hardware Purchase
The initial hardware purchase is often thought to be the most expensive phase, but in reality after factoring in the support costs for a piece of hardware it turns out to be about one-third to one-fourth of the TCO. The initial price is often the easiest to evaluate, but should carefully be weighed against the long term costs of purchasing a specific brand or type of hardware.
Often vendors will allow for additional years of warranty coverage, or higher levels of support to be purchased when the system is first bought. These are often a wise investment if the hardware will be used longer then the initial warranty period. The increased level of support can often mean that your staff will spend less time supporting the system, and more time working on more beneficial tasks.
Support
The support costs are often the most expensive phases of hardware ownership. The support costs include patching the operating system, supplying power to the system, cooling the system and managing the applications hosted on the system. These costs are amortized over the life of the system, and over time can add up to be the most expensive part of the TCO formula. Often, these support costs are also where the most efficiencies can be gained to lower the TCO of the system.
There are many things that can be done to lower the support costs around hardware, most involve improved processes to cut back the amount of time staff have to spend manually managing each specific server. The most notable of these is automation of patch management. By utilizing tools to automate patch deployments and status monitoring, staff can cut significant manual administration time from each specific server. Proactive monitoring of system and application health can also play an important role in cutting down TCO for hardware and associated services. There are many packages available today to assist system administrators in proactively correcting both hardware and software faults before they cause a failure for the end users. These apps can ensure that staff isolate and correct problems as soon as possible to minimize the necessary time to correct faults.
Utilization is another space where the TCO for your servers can be lowered. By ensuring that servers do not run at idle for long periods of time, you can ensure that any power being used by the servers is being used efficiently. Often times, a single server can handle the load that multiple servers used to handle. It is much more efficient to power and cool a single server then multiple servers in this case, and scales very well as you begin looking at utilization rates across dozens or hundreds of servers.
Refresh
The final phase to evaluate for all hardware purchases is the refresh cycle. All hardware has a finite lifecycle in which at the end it will need to be replaced because it is either obsolete and not cost effective to maintain any longer. Obsolete in this context can be used in two ways, first to mean the hardware is so old is can no longer operate with the current operating systems, tools and patches available, or it no longer meets the business needs of your company.
There are often two methods that companies use to replace aging hardware, the first and most common is just purchasing new hardware when a system is no longer under warranty or has gotten too slow to use in the IT environment. More and more though, firms are implementing a rolling refresh cycle to add a level of predictability to all hardware purchases. A rolling refresh cycle allows a company to more clearly outlay capitol for IT investments, and better plan long term cycles for purchases, upgrades and replacements. Typically, a rolling refresh schedule is based on the standard warranty with newer server hardware, 3-5 years. A rolling refresh cycle also allows IT staff to better plan work loads by knowing ahead of time that new servers will need to be configured, tested and put into production.
Refresh cycle planning should also include an assessment of upcoming technologies and how that will affect purchases two and three years down the line. Every year hardware is faster and faster then before, and provides new possibilities for the amount of data that can be processed. In addition new technologies around virtualization are changing the dynamic of how system administrators provision new systems. No longer do system administrators add a single new server because of a single new application, today many different apps can be run on a single piece of hardware and kept separate from each other by using virtualization technologies.
As you assess your refresh cycle an important part of the TCO calculation is determining what applications can run within virtualized environments, and which will need separate hardware to run on. This will determine what level of consolidation can occur from year to year as the refresh occurs. As you look toward implementing a rolling refresh cycle, a first step is to understand how many existing servers are in place and how many existing applications. That data can then be used to develop a matrix of how things would look if virtualization were employed, and how a rolling refresh cycle could be utilized over time to ensure that all pieces of the infrastructure are upgraded in an expected period of time.
Minimizing the TCO of IT hardware is a key component of ensuring that the long term costs of owning the hardware are predictable and manageable. A rolling refresh cycle, paired with newer technologies like monitoring tools, automation tools and virtualization can allow IT staff to clearly plan how hardware will be used from purchase to end of life and how it will then be replaced. This cycle ensures staff can plan for future upgrades and migrations, as well as avoid last minute unexpected upgrades.
Often times when a company begins to assess the total cost of ownership (TCO) around its IT assets, it must involve teams not traditionally involved in IT planning. These teams can include facilities, engineering, building managers, application developers and data base administrators. Each of these groups can provide valuable input on how the servers and other infrastructure affect there environments and costs on a yearly basis.
There are three primary phases to all hardware purchases:
Initial Hardware Purchase
The initial hardware purchase is often thought to be the most expensive phase, but in reality after factoring in the support costs for a piece of hardware it turns out to be about one-third to one-fourth of the TCO. The initial price is often the easiest to evaluate, but should carefully be weighed against the long term costs of purchasing a specific brand or type of hardware.
Often vendors will allow for additional years of warranty coverage, or higher levels of support to be purchased when the system is first bought. These are often a wise investment if the hardware will be used longer then the initial warranty period. The increased level of support can often mean that your staff will spend less time supporting the system, and more time working on more beneficial tasks.
Support
The support costs are often the most expensive phases of hardware ownership. The support costs include patching the operating system, supplying power to the system, cooling the system and managing the applications hosted on the system. These costs are amortized over the life of the system, and over time can add up to be the most expensive part of the TCO formula. Often, these support costs are also where the most efficiencies can be gained to lower the TCO of the system.
There are many things that can be done to lower the support costs around hardware, most involve improved processes to cut back the amount of time staff have to spend manually managing each specific server. The most notable of these is automation of patch management. By utilizing tools to automate patch deployments and status monitoring, staff can cut significant manual administration time from each specific server. Proactive monitoring of system and application health can also play an important role in cutting down TCO for hardware and associated services. There are many packages available today to assist system administrators in proactively correcting both hardware and software faults before they cause a failure for the end users. These apps can ensure that staff isolate and correct problems as soon as possible to minimize the necessary time to correct faults.
Utilization is another space where the TCO for your servers can be lowered. By ensuring that servers do not run at idle for long periods of time, you can ensure that any power being used by the servers is being used efficiently. Often times, a single server can handle the load that multiple servers used to handle. It is much more efficient to power and cool a single server then multiple servers in this case, and scales very well as you begin looking at utilization rates across dozens or hundreds of servers.
Refresh
The final phase to evaluate for all hardware purchases is the refresh cycle. All hardware has a finite lifecycle in which at the end it will need to be replaced because it is either obsolete and not cost effective to maintain any longer. Obsolete in this context can be used in two ways, first to mean the hardware is so old is can no longer operate with the current operating systems, tools and patches available, or it no longer meets the business needs of your company.
There are often two methods that companies use to replace aging hardware, the first and most common is just purchasing new hardware when a system is no longer under warranty or has gotten too slow to use in the IT environment. More and more though, firms are implementing a rolling refresh cycle to add a level of predictability to all hardware purchases. A rolling refresh cycle allows a company to more clearly outlay capitol for IT investments, and better plan long term cycles for purchases, upgrades and replacements. Typically, a rolling refresh schedule is based on the standard warranty with newer server hardware, 3-5 years. A rolling refresh cycle also allows IT staff to better plan work loads by knowing ahead of time that new servers will need to be configured, tested and put into production.
Refresh cycle planning should also include an assessment of upcoming technologies and how that will affect purchases two and three years down the line. Every year hardware is faster and faster then before, and provides new possibilities for the amount of data that can be processed. In addition new technologies around virtualization are changing the dynamic of how system administrators provision new systems. No longer do system administrators add a single new server because of a single new application, today many different apps can be run on a single piece of hardware and kept separate from each other by using virtualization technologies.
As you assess your refresh cycle an important part of the TCO calculation is determining what applications can run within virtualized environments, and which will need separate hardware to run on. This will determine what level of consolidation can occur from year to year as the refresh occurs. As you look toward implementing a rolling refresh cycle, a first step is to understand how many existing servers are in place and how many existing applications. That data can then be used to develop a matrix of how things would look if virtualization were employed, and how a rolling refresh cycle could be utilized over time to ensure that all pieces of the infrastructure are upgraded in an expected period of time.
Minimizing the TCO of IT hardware is a key component of ensuring that the long term costs of owning the hardware are predictable and manageable. A rolling refresh cycle, paired with newer technologies like monitoring tools, automation tools and virtualization can allow IT staff to clearly plan how hardware will be used from purchase to end of life and how it will then be replaced. This cycle ensures staff can plan for future upgrades and migrations, as well as avoid last minute unexpected upgrades.
Thursday, August 28, 2008
Defining "the edge"
I was in a planning meeting with a customer recently and we were assessing the customers security plan. We had two major topics to discuss, the first was in regards to data management and compliance. The second, and the one we discussed at length was in regards to previous policies they had around what they called “the edge”, the previous end of their network and the beginning of folks and systems they could not trust. The discussion went on for a while with us working towards consensus on how to define “the edge.” I believe we made the right decisions for there needs, but wanted to continue the discussion, I imagine most companies have this discussion at some point and will continue as new technologies evolve.
At one time "the edge" of any given network was easy to find; the last router between you and the upstream access provider. But today, "the edge" is getting increasingly difficult to find, and this has implications for the fundamentals of Information Technology (IT) including patching and password policies, and the most complicated of questions including privacy, monitoring and forensics. Today we have to evaluate many different details in regards to where “the edge” truly is, these include PDAs, company laptops with VPN access, employees home systems, thumb drives, and outside vendors/contractors.
The most important implications around defining what constitutes “the edge” is defining how customers, and staff will be able to access servers, services and storage. By clearly defining “the edge” we can then work to define what services will be publicly accessible, and which ones will be restricted by VPN access, firewalls, or other mechanisms. By defining “the edge” we also have a baseline to use when defining policies for information management, information tracking and information retention. These are critical areas in todays world of compliance, being able to precisely say who accessed and stored what day and when, is almost necessity.
When defining “the edge”, I start by listing all possible devices (laptop, desktop, thumb drive, PDA, cell phone, etc) that an employee or partner could use to access data that is not publicly available. This should be a list of devices currently allowed and possible technologies to employ. This data could include sales presentations, engineering documents, support forums, or any other data that is intentionally kept private to provide a competitive edge in your industry.
Second, I work to list where those devices could possible be used (office, Starbucks, employees home, airport, restaurant, etc). This is important to understand what implications those devices have including being lost, stolen, or a staff member having a conversation listened too by an outside party. This list should include the associate risks and possibility of it occurring at each location. The chance of a desktop system being stolen from the office is relatively low compared to a laptop being stolen while at the coffee shop. This does not imply that less security should be utilized to protect data on office systems, but that different techniques should be employed to do so.
The final component of defining “the edge” is defining appropriate policies for each device based on risk to the device and associated data, and a cost benefit tradeoff analysis for which devices should be allowed and which should not because of the level of risk they pose. These policies should take into account technologies like full disk encryption, passwords and non-reusable password generators, Virtual Private Network (VPN) technologies, and physical security like cable locks for laptops. Each potential technology is a tool to lower the risk and increase the reward for offering various tools and capabilities to employees.
Ultimately, this is a discussion around what risks can be outweighed by there benefits in a business setting. Often times staff can gain a significant level of productivity by having access too laptops, PDAs and other mobile devices, the company must weigh that additional productivity against the risk of a company device becoming compromised.
The concept of “the edge” is always going to be present for a companies IT infrastructure. As Web 2.0 and associated architectures grow, the ability to present more and more tools and capability to staff is only going to increase. By properly laying the ground work for how staff securely access these systems, a company can ensure that new tools can increase productivity without negatively impacting the risk to the company.
At one time "the edge" of any given network was easy to find; the last router between you and the upstream access provider. But today, "the edge" is getting increasingly difficult to find, and this has implications for the fundamentals of Information Technology (IT) including patching and password policies, and the most complicated of questions including privacy, monitoring and forensics. Today we have to evaluate many different details in regards to where “the edge” truly is, these include PDAs, company laptops with VPN access, employees home systems, thumb drives, and outside vendors/contractors.
The most important implications around defining what constitutes “the edge” is defining how customers, and staff will be able to access servers, services and storage. By clearly defining “the edge” we can then work to define what services will be publicly accessible, and which ones will be restricted by VPN access, firewalls, or other mechanisms. By defining “the edge” we also have a baseline to use when defining policies for information management, information tracking and information retention. These are critical areas in todays world of compliance, being able to precisely say who accessed and stored what day and when, is almost necessity.
When defining “the edge”, I start by listing all possible devices (laptop, desktop, thumb drive, PDA, cell phone, etc) that an employee or partner could use to access data that is not publicly available. This should be a list of devices currently allowed and possible technologies to employ. This data could include sales presentations, engineering documents, support forums, or any other data that is intentionally kept private to provide a competitive edge in your industry.
Second, I work to list where those devices could possible be used (office, Starbucks, employees home, airport, restaurant, etc). This is important to understand what implications those devices have including being lost, stolen, or a staff member having a conversation listened too by an outside party. This list should include the associate risks and possibility of it occurring at each location. The chance of a desktop system being stolen from the office is relatively low compared to a laptop being stolen while at the coffee shop. This does not imply that less security should be utilized to protect data on office systems, but that different techniques should be employed to do so.
The final component of defining “the edge” is defining appropriate policies for each device based on risk to the device and associated data, and a cost benefit tradeoff analysis for which devices should be allowed and which should not because of the level of risk they pose. These policies should take into account technologies like full disk encryption, passwords and non-reusable password generators, Virtual Private Network (VPN) technologies, and physical security like cable locks for laptops. Each potential technology is a tool to lower the risk and increase the reward for offering various tools and capabilities to employees.
Ultimately, this is a discussion around what risks can be outweighed by there benefits in a business setting. Often times staff can gain a significant level of productivity by having access too laptops, PDAs and other mobile devices, the company must weigh that additional productivity against the risk of a company device becoming compromised.
The concept of “the edge” is always going to be present for a companies IT infrastructure. As Web 2.0 and associated architectures grow, the ability to present more and more tools and capability to staff is only going to increase. By properly laying the ground work for how staff securely access these systems, a company can ensure that new tools can increase productivity without negatively impacting the risk to the company.
Wednesday, August 27, 2008
Risk Management in HPC
Risk management is a very broad topic within the project management space. It covers planning for and understanding the most unimaginable of possibilities within a project so that a plan is in place to respond to these situations and mitigate risk across the project. I will focus on risk management specifically in High Performance Compute (HPC) deployments. HPC, like any other specialty area has it's own specific risks and possibilities. Within HPC these risks are both procedural and technical in nature, but have equal implications to the overall delivery of a successful solution.
Risk management in any project begins with a risk assessment, this includes both identifying risks and possible risk mitigation techniques. This can be done through a variety of methods including brainstorming, the Delphi technique, or by referencing internal documentation about similar, previous projects. This initial assessment phase is critical to ensure that both risks and responses are captured. By capturing both of these upfront, it allows for better communication around the known risks, and better preparation for managing unknown risks. This risk assessment will produce a risk matrix, this is the documented list of possible risks to a project and there mitigation, or response plans. The risk matrix will become part of the overall project delivery plan.
Risk Matrix
When beginning any HPC project, either an initial deployment or an upgrade, it is important to develop a risk matrix. This can include both known risks (late delivery, poor performance, failed hardware) as well as unknown risks. The unknown risks category is much more difficult to define for just that reason, but a common approach is to define levels of severity and responses. These responses can include procedural details, escalation details, communication information and documentation about the problem to prevent a reoccurrence.
This matrix should include a variety of information including:
Known Risks
Often times, known risks are the easiest for people to plan for, but very difficult to handle. This understanding up front and anticipation of the risk or problem can often fool us into believing we know the best response to the problem, when often the only way to truly understand how to respond to a problem is to do it incorrectly one or more times.
Lets explore some common risks that are specific to HPC deployments, and the most common mitigation strategies to combat them:
Application Scaling
A fundamental premise of HPC is that applications should scale in a way that makes more hardware produce more accurate results and/or more efficient production of data. Because of this an application is often expected to perform with the same scalability on 64 nodes, as it does on 128 and often many more. This type of scalability must be architected into the application as it is written and improved on as hardware performance evolves over time. Every time a newer, faster or bigger cluster is installed, there is an inherent risk that the applications previously used will not properly scale on the new platform.
Often times the best mitigation strategy for this risk is proper planning, testing and benchmarking; before system deployment. The most difficult time to manage an application scaling problem is after a customer's hardware has been delivered and installed. By benchmarking and testing the application prior to shipment, the expectations with the customer can be properly set. It also allows proper time for working with any development teams to troubleshoot scaling problems and correct them before presenting results and completing acceptance testing with the customer.
Facility Limitations
HPC solutions often use large amounts of power, cooling and space within a data center compared to a companies business support systems or database centric systems. Because of the large facility needs of HPC it is very common for customers to underestimate the facility needs, or the numbers to be poorly communicated from a vendor to a customer. The power and cooling requirements can also vary widely based upon the customers final use and intended application of the cluster.
All facility design issues should be managed and planed for before hardware is shipped or systems are assembled. To ensure a smooth cluster delivery, it is critical that site planning and assessment be done as part of the system design. This site planning should ensure there is enough power, cooling and space to accommodate the cluster. It should additionally work to ensure the power and cooling are in the proper places and can be directed to the cluster in the recommended fashion.
Mean Time between Failure (MTBF)
MTBF is a calculation used to understand how often components across a single node or cluster will fail. It averages the known and designed life cycle of all individual components to provide a time between each individual component failure. These component failures can either be severe enough to impact the whole system, or just portions of a cluster based on the cluster's design. Often times a completed cluster will fail in unexpected ways because of the MTBF characteristics of putting large numbers of compute nodes in a single fabric. If proper redundancy is not built into critical systems of the cluster, a customer satisfaction issue can develop because of prolonged and unplanned for outages.
By properly assessing all uptime requirements from the customer, a system can be designed that will provide the uptime necessary to conduct business regardless of the MTBF that is collective across all components. Each individual service and capability of the cluster should be assessed to ensure that the proper level of redundancy including clustered nodes, redundant power, and redundant disks is included with the complete solution.
Performance Targets, I/O and Compute
Performance guarantees are often included in HPC proposals to customers to provide a level of comfort when planning times for job completion and capacity planning for an organization. These numbers can often be sources of concern as a system is brought online if compute capacity is not as promised or I/O is not operating as fast as expected or promised.
There is often misunderstandings with complete cluster deployments about a clusters capability for sustained versus peak performance. Sustained is most often the number used for a representative test of how the system will perform over its life cycle. Where as peak is the level of performance often stated for bragging rights because it is the theoretical maximum potential of a given cluster.
There is very little that can be done after delivery of a system if this type of risk comes up, other then giving the customer the additional hardware to pull the sustained performance number up to the peak performance number. This can be a very expensive response. This is the reason that the staff doing HPC architecture must fully understand application benchmarking and performance when designing new clusters. All numbers should also be reviewed by multiple people, this will insure errors in math or testing methodologies do not go unnoticed.
Unknown Risks
Often times planning for unknown risks can be the most stressful, but can yield the most gains when actually responding. This is because of a lack of prior perceptions and the ability to be very creative with responses and future mitigation strategies. Risk planning for unknown risks is often an exercise in understanding the levels of severities that could occur with a problem, and associating it with the appropriate level of response and future prevention.
When defining response strategies for unknown risks, often the first step is to define levels of severity that could develop from any given problem. A common list is:
Path Forward
The most important component of risk management is skill and experience development. It is important to ensure that as a company, you have processes to document all experience that is gained as part of risk management within managing your projects. This knowledge must be documented so that other teams, new teams and new staff can learn from previous experience of the company.
The more efficient a job that is done with documenting risk response and lessons learned, the more efficiently companies can scope future projects. This allows companies to much more accurately assess costs for future projects, as well as risk versus reward tradeoffs for large, complex projects. Ultimately the best way to manage risk is to understand it before beginning actual deployment and implementation on a project. This comes from a combination of utilizing all data collected on previous projects as well as techniques like brain storming and the Delphi technique to ensure as many possible risks are documented with appropriate response plans.
Risk management in any project begins with a risk assessment, this includes both identifying risks and possible risk mitigation techniques. This can be done through a variety of methods including brainstorming, the Delphi technique, or by referencing internal documentation about similar, previous projects. This initial assessment phase is critical to ensure that both risks and responses are captured. By capturing both of these upfront, it allows for better communication around the known risks, and better preparation for managing unknown risks. This risk assessment will produce a risk matrix, this is the documented list of possible risks to a project and there mitigation, or response plans. The risk matrix will become part of the overall project delivery plan.
Risk Matrix
When beginning any HPC project, either an initial deployment or an upgrade, it is important to develop a risk matrix. This can include both known risks (late delivery, poor performance, failed hardware) as well as unknown risks. The unknown risks category is much more difficult to define for just that reason, but a common approach is to define levels of severity and responses. These responses can include procedural details, escalation details, communication information and documentation about the problem to prevent a reoccurrence.
This matrix should include a variety of information including:
- Risk name – Should be unique within the company to facilitate communication between groups and departments
- Risk Type – Minimal, Moderate, Severe, Extreme, etc
- Cost if this risk occurs – This can be in time, money or loss of reputation, or all of the above.
- Process to recovery – It is important to document early on how to respond to the risk and correct any problems that have developed because of the risk
- Risk Owner – Often times a specific individual has additional experience with dealing with a specific risk and can work as a Subject Matter Expert (SME) for the project team
- Outcome documentation – Clearing defining what should be documented should the risk occur so that it can be responded too
- Communication Channels - different risks require that different staff and management become engaged, it is important to document who should be involved should a risk occur
- Time Component – Every risk has a response, every response has a time component associated with it. It is important to understand these time components up front, it will allow project management staff to adjust schedules accordingly should a risk occur
Known Risks
Often times, known risks are the easiest for people to plan for, but very difficult to handle. This understanding up front and anticipation of the risk or problem can often fool us into believing we know the best response to the problem, when often the only way to truly understand how to respond to a problem is to do it incorrectly one or more times.
Lets explore some common risks that are specific to HPC deployments, and the most common mitigation strategies to combat them:
Application Scaling
A fundamental premise of HPC is that applications should scale in a way that makes more hardware produce more accurate results and/or more efficient production of data. Because of this an application is often expected to perform with the same scalability on 64 nodes, as it does on 128 and often many more. This type of scalability must be architected into the application as it is written and improved on as hardware performance evolves over time. Every time a newer, faster or bigger cluster is installed, there is an inherent risk that the applications previously used will not properly scale on the new platform.
Often times the best mitigation strategy for this risk is proper planning, testing and benchmarking; before system deployment. The most difficult time to manage an application scaling problem is after a customer's hardware has been delivered and installed. By benchmarking and testing the application prior to shipment, the expectations with the customer can be properly set. It also allows proper time for working with any development teams to troubleshoot scaling problems and correct them before presenting results and completing acceptance testing with the customer.
Facility Limitations
HPC solutions often use large amounts of power, cooling and space within a data center compared to a companies business support systems or database centric systems. Because of the large facility needs of HPC it is very common for customers to underestimate the facility needs, or the numbers to be poorly communicated from a vendor to a customer. The power and cooling requirements can also vary widely based upon the customers final use and intended application of the cluster.
All facility design issues should be managed and planed for before hardware is shipped or systems are assembled. To ensure a smooth cluster delivery, it is critical that site planning and assessment be done as part of the system design. This site planning should ensure there is enough power, cooling and space to accommodate the cluster. It should additionally work to ensure the power and cooling are in the proper places and can be directed to the cluster in the recommended fashion.
Mean Time between Failure (MTBF)
MTBF is a calculation used to understand how often components across a single node or cluster will fail. It averages the known and designed life cycle of all individual components to provide a time between each individual component failure. These component failures can either be severe enough to impact the whole system, or just portions of a cluster based on the cluster's design. Often times a completed cluster will fail in unexpected ways because of the MTBF characteristics of putting large numbers of compute nodes in a single fabric. If proper redundancy is not built into critical systems of the cluster, a customer satisfaction issue can develop because of prolonged and unplanned for outages.
By properly assessing all uptime requirements from the customer, a system can be designed that will provide the uptime necessary to conduct business regardless of the MTBF that is collective across all components. Each individual service and capability of the cluster should be assessed to ensure that the proper level of redundancy including clustered nodes, redundant power, and redundant disks is included with the complete solution.
Performance Targets, I/O and Compute
Performance guarantees are often included in HPC proposals to customers to provide a level of comfort when planning times for job completion and capacity planning for an organization. These numbers can often be sources of concern as a system is brought online if compute capacity is not as promised or I/O is not operating as fast as expected or promised.
There is often misunderstandings with complete cluster deployments about a clusters capability for sustained versus peak performance. Sustained is most often the number used for a representative test of how the system will perform over its life cycle. Where as peak is the level of performance often stated for bragging rights because it is the theoretical maximum potential of a given cluster.
There is very little that can be done after delivery of a system if this type of risk comes up, other then giving the customer the additional hardware to pull the sustained performance number up to the peak performance number. This can be a very expensive response. This is the reason that the staff doing HPC architecture must fully understand application benchmarking and performance when designing new clusters. All numbers should also be reviewed by multiple people, this will insure errors in math or testing methodologies do not go unnoticed.
Unknown Risks
Often times planning for unknown risks can be the most stressful, but can yield the most gains when actually responding. This is because of a lack of prior perceptions and the ability to be very creative with responses and future mitigation strategies. Risk planning for unknown risks is often an exercise in understanding the levels of severities that could occur with a problem, and associating it with the appropriate level of response and future prevention.
When defining response strategies for unknown risks, often the first step is to define levels of severity that could develop from any given problem. A common list is:
- Most severe level of risk, requires executive management level response to the customer and has a high percentage cost to the project (greater then 50% of project revenue is at risk).
- Severe level of risk, requires executive level of response and carries a medium level of financial risk (less then 50% of project revenue is at risk).
- Medium level project risk, requires senior management response, could or could not have a financial impact on the project, but does have a deliverable and schedule component.
- Lower level risk, has an impact on project schedule, but no negative impact on project financials.
- The lowest level of project risk, often just a communication issue with a customer or potential misunderstanding. Often no schedule impact or financial impact to the project.
- Steps to research and understand the problem.
- Communication channels, who needs to be communicated with for a problem of this magnitude and how are they communicated with. This needs to include both customer and company contacts that will be necessary to correct the problem.
- Flow chart for responding, this is the path to determining the appropriate response and deciding if more resources, either financial or staffing, are needed to correct the risk.
- Documentation to prevent future occurrences is important. It is important to ensure that any information about the project is gathered and documented to be used in house to prevent future occurrences of the same risk.
- Risk closure document. A checklist to document that all protocol was followed and the risk was corrected. This should include components that the risk will not return on the same project because mitigation techniques have been implemented.
Path Forward
The most important component of risk management is skill and experience development. It is important to ensure that as a company, you have processes to document all experience that is gained as part of risk management within managing your projects. This knowledge must be documented so that other teams, new teams and new staff can learn from previous experience of the company.
The more efficient a job that is done with documenting risk response and lessons learned, the more efficiently companies can scope future projects. This allows companies to much more accurately assess costs for future projects, as well as risk versus reward tradeoffs for large, complex projects. Ultimately the best way to manage risk is to understand it before beginning actual deployment and implementation on a project. This comes from a combination of utilizing all data collected on previous projects as well as techniques like brain storming and the Delphi technique to ensure as many possible risks are documented with appropriate response plans.